CTH U over ELK CREEK

2.4M N JCT CTH E · County 103, Wisconsin · Built 1950 · 1 Lanes · 163 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
P52015100000000
Year Built
1950
Length
11 m (36.1 ft)
Max Span
10.7 m
Width
5.7 m (18.7 ft)
Lanes
1
Daily Traffic
163
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$119,000
Total Project Cost
$179,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.