CTH C over E BR ROOT RIVER CANAL
3.5M E JCT USH 45 · County 101, Wisconsin · Built 1939 · 2 Lanes · 5,500 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
42.718869, -87.982378
This bridge is in worse condition than 88% of bridges in County 101. The average bridge in Wisconsin is 0 years old; this one is 87 years old.
Nearby Bridges
STH 20 over E BR ROOT RIVER CANAL
Built 2020
LRD IVES GROVE RD over E BR ROOT RIVER CANAL
Built 2004
IH 41 SB/94 EB over STH 20
Built 2015
IH 41 NB/94 WB over STH 20
Built 2014
CTH A over WEST BRANCH ROOT RIVER
Built 2017
CTH C-SPRING ST over IH 41/94
Built 2014
STH 20 over W BR ROOT RIVER CANAL
Built 1968
CTH C over W. BR. ROOT RIVER CANAL
Built 1994
IH 41 SB/IH 94 EB over LRD 58TH RD
Built 2019
STH 20 over BR W BR ROOT RIVER CANAL
Built 2020
Bridge Details
- Structure #
- P51091600000000
- Year Built
- 1939
- Length
- 6.2 m (20.3 ft)
- Max Span
- 6.1 m
- Width
- 15.2 m (49.9 ft)
- Lanes
- 2
- Daily Traffic
- 5,500
- Material
- Steel
- Design
- Arch - Deck
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $133,000
- Total Project Cost
- $199,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.