LRD 75TH ST over BEAVER BROOK

0.2M N JCT CTH J · County 095, Wisconsin · Built 1966 · 2 Lanes · 205 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
P48091600000000
Year Built
1966
Length
11 m (36.1 ft)
Max Span
5.3 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
205
Material
Wood or Timber
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$119,000
Total Project Cost
$179,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.