CTH Y over BR RUSH RIVER

1.0M N JCT STH 29 · County 093, Wisconsin · Built 1991 · 2 Lanes · 772 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
P47094900000000
Year Built
1991
Length
7.3 m (24 ft)
Max Span
6.7 m
Width
9.7 m (31.8 ft)
Lanes
2
Daily Traffic
772
Material
Wood or Timber
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.