CTH N over RUSH RIVER

0.1M N JCT CTH G · County 093, Wisconsin · Built 1976 · 2 Lanes · 505 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
P47016500000000
Year Built
1976
Reconstructed
2013
Length
29.4 m (96.5 ft)
Max Span
29.1 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
505
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$321,000
Total Project Cost
$481,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.