CTH O over SPRING CREEK

1.2M S JCT USH 10 · County 093, Wisconsin · Built 1918 · 2 Lanes · 216 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
P47007900000000
Year Built
1918
Reconstructed
1976
Length
6.7 m (22 ft)
Max Span
6.5 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
216
Material
Wood or Timber
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.