LRD S HOWELL AVE over UP RR

0.4M N JCT STH 38 · County 079, Wisconsin · Built 1958 · 2 Lanes · 6,573 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
P40050900000000
Year Built
1958
Reconstructed
2010
Length
37.5 m (123 ft)
Max Span
14 m
Width
21.9 m (71.9 ft)
Lanes
2
Daily Traffic
6,573
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$670,000
Total Project Cost
$1,006,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.