LRD DOVER RD over MECAN RIVER
0.3M W JCT STH 22 · County 077, Wisconsin · Built 1977 · 1 Lanes · 153 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 4 | Poor |
| Substructure | 6 | Satisfactory |
Location
43.937714, -89.319669
This bridge is in worse condition than 93.8% of bridges in County 077. The average bridge in Wisconsin is 0 years old; this one is 49 years old.
Nearby Bridges
LRD DIXIE AVE over MECAN RIVER
Built 1979
CTH E over MECAN RIVER
Built 1964
LRD 15TH DR over MECAN RIVER
Built 2004
STH 22 over MECAN RIVER
Built 1951
LRD 14TH AVE over CHAFFEE CREEK
Built 2000
LRD 14TH AVE over MECAN RIVER
Built 1999
CTH Z over CHAFEE CREEK
Built 2007
LRD 11TH LANE over CHAFFEE CREEK
Built 2012
LRD CZECH COURT over LUNCH CREEK
Built 2021
CTH JJ over MECAN RIVER
Built 2024
Bridge Details
- Structure #
- P39002500000000
- Year Built
- 1977
- Length
- 12.4 m (40.7 ft)
- Max Span
- 12.1 m
- Width
- 5.7 m (18.7 ft)
- Lanes
- 1
- Daily Traffic
- 153
- Material
- Prestressed Concrete
- Design
- Channel Beam
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $130,000
- Total Project Cost
- $195,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.