LRD ST PAUL RD over THE OUTLET
1.2M S JCT CTH W · County 075, Wisconsin · Built 1930 · 2 Lanes · 110 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
45.213972, -87.954333
This bridge is in worse condition than 92.6% of bridges in County 075. The average bridge in Wisconsin is 0 years old; this one is 96 years old.
Nearby Bridges
CTH W over OUTLET CREEK
Built 1986
USH 141 over PESHTIGO RIVER
Built 1992
LRD NOQUEBAY RD over OUTLET CREEK
Built 1987
CTH W - MAIN AVENU over PESHTIGO RIVER
Built 2001
LRD SMITH CREEK RD over E&L RR
Built 1995
LRD WAYSIDE ROAD ( over MIDDLE INLET CREEK
Built 1960
LRD MAPLE BEACH RD over MIDDLE INLET CREEK
Built 1965
USH 141 over LOWER MIDDLE INLET CREEK
Built 1989
CTH P over PESHTIGO RIVER
Built 1976
CTH X over MIDDLE INLET CREEK
Built 1986
Bridge Details
- Structure #
- P38008600000000
- Year Built
- 1930
- Reconstructed
- 1975
- Length
- 13.6 m (44.6 ft)
- Max Span
- 13 m
- Width
- 9.9 m (32.5 ft)
- Lanes
- 2
- Daily Traffic
- 110
- Material
- Concrete
- Design
- Tee Beam
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $139,000
- Total Project Cost
- $209,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.