CTH C over E BR LT EAU PLEINE RIVER

1.8M E STH 13 · County 073, Wisconsin · Built 1941 · 2 Lanes · 1,465 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
P37038000000000
Year Built
1941
Reconstructed
1996
Length
16.1 m (52.8 ft)
Max Span
15.2 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
1,465
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.