LRD SUNRISE RD over TRAPPE RIVER

0.8M N JCT CTH G · County 073, Wisconsin · Built 1973 · 2 Lanes · 27 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
P37011500000000
Year Built
1973
Length
20.5 m (67.3 ft)
Max Span
19.6 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
27
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.