LRD WEGNER RD (DEA over N FK COPPER RIVER

2.4M N JCT CTH M · County 069, Wisconsin · Built 1972 · 2 Lanes · 51 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
P35094100000000
Year Built
1972
Length
10.3 m (33.8 ft)
Max Span
9.1 m
Width
7.4 m (24.3 ft)
Lanes
2
Daily Traffic
51
Material
Prestressed Concrete
Design
Channel Beam
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.