LRD FOSTER ST over DEVIL CREEK
0.6M S JCT STH 64 · County 069, Wisconsin · Built 1967 · 2 Lanes · 2,036 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
45.171047, -89.718925
This bridge is in worse condition than 76.6% of bridges in County 069. The average bridge in Wisconsin is 0 years old; this one is 59 years old.
Nearby Bridges
LRD STATE ST over WISCONSIN RIVER 38
Built 1966
STH 64-STH 107-W M over WISCONSIN RIVER 39
Built 1927
STH 64-STH 107-W M over WISCONSIN RIVER 38
Built 1990
LRD SCOTT RD over DEVIL CREEK
Built 1985
STH 64-W MAIN ST over PRAIRIE RIVER
Built 1904
LRD POLK ST over PRAIRIE RIVER
Built 1964
LRD E 3RD ST over PRAIRIE RIVER
Built 1962
LRD JOE SNOW RD over DEVIL CREEK
Built 1996
LRD PIER ST over PRAIRIE RIVER
Built 1969
CTH K-CENTER AVE over WISCONSIN RIVER 37
Built 1996
Bridge Details
- Structure #
- P35070500000000
- Year Built
- 1967
- Length
- 17.2 m (56.4 ft)
- Max Span
- 16.8 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 2,036
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $308,000
- Total Project Cost
- $463,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.