CTH T over BIG SOMO RIVER
1.3M S JCT USH 8 · County 069, Wisconsin · Built 1971 · 2 Lanes · 86 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
45.536708, -89.969997
This bridge is in worse condition than 94.9% of bridges in County 069. The average bridge in Wisconsin is 0 years old; this one is 55 years old.
Nearby Bridges
USH 8 over BRYANT CREEK
Built 2006
LRD MEYER RD over BRANT CREEK
Built 2008
LRD EAST CIRCLE DR over SOMO RIVER
Built 1973
USH 8 over SCOTT CREEK
Built 2022
LRD MARTIN RD (DEA over BIG SOMO RIVER
Built 1987
LRD W CIRCLE DRIVE over SOMO RIVER
Built 1990
LRD PINE TREE LANE over SOMO RIVER
Built 1962
USH 8 over LITTLE SOMO RIVER
Built 2023
USH 8 over SOMO RIVER
Built 1983
USH 8 over SOMO CREEK
Built 1981
Bridge Details
- Structure #
- P35004400000000
- Year Built
- 1971
- Length
- 22.6 m (74.1 ft)
- Max Span
- 21 m
- Width
- 9.2 m (30.2 ft)
- Lanes
- 2
- Daily Traffic
- 86
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $256,000
- Total Project Cost
- $384,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.