CTH K over SWAMP CREEK

1.2M E JCT CTH Z · County 067, Wisconsin · Built 2007 · 2 Lanes · 528 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
P34004400000000
Year Built
2007
Length
6.6 m (21.7 ft)
Max Span
2.6 m
Lanes
2
Daily Traffic
528
Material
Steel
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.