CTH T over SAUR CREEK

0.2M W JCT CTH V · County 063, Wisconsin · Built 1978 · 2 Lanes · 1,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
P32008200000000
Year Built
1978
Length
27.8 m (91.2 ft)
Max Span
25.9 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
1,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.