CTH WG over BR DUTCH GAP CANAL

0.6M E JCT USH 45 · County 059, Wisconsin · Built 1941 · 2 Lanes · 5,200 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
P30091000000000
Year Built
1941
Length
7 m (23 ft)
Max Span
6.5 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
5,200
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$143,000
Total Project Cost
$214,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.