LRD SANDY BEACH RO over LOST CREEK

0.5 MI N JCT POWELL RD · County 051, Wisconsin · Built 1930 · 1 Lanes · 120 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
P26092100000000
Year Built
1930
Length
7.1 m (23.3 ft)
Max Span
6.6 m
Width
6.7 m (22 ft)
Lanes
1
Daily Traffic
120
Material
Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$89,000
Total Project Cost
$134,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.