LRD ADVANCE RD over RICHLAND CREEK

2.4M E JCT STH 69 · County 045, Wisconsin · Built 1958 · 2 Lanes · 58 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
P23018200000000
Year Built
1958
Length
14.4 m (47.2 ft)
Max Span
13.9 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
58
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.