LRD TWIN GROVE RD over BR RICHLAND CREEK

0.6M S JCT CTH K · County 045, Wisconsin · Built 1930 · 2 Lanes · 189 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
P23005500000000
Year Built
1930
Reconstructed
1970
Length
9.1 m (29.9 ft)
Max Span
8.7 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
189
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$105,000
Total Project Cost
$157,000