LRD SEYMOUR ST over W BR FOND DU LAC RIVER

0.3M N JCT USH 151 0.7 M · County 039, Wisconsin · Built 1962 · 2 Lanes · 2,400 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
P20072700000000
Year Built
1962
Length
17.7 m (58.1 ft)
Max Span
17.2 m
Width
17.4 m (57.1 ft)
Lanes
2
Daily Traffic
2,400
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$354,000
Total Project Cost
$532,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.