LRD PROMEN DR over LAKESIDE CREEK
0.4M N JCT USH 151 · County 039, Wisconsin · Built 1927 · 2 Lanes · 3,900 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
43.797528, -88.443528
This bridge is in worse condition than 90.5% of bridges in County 039. The average bridge in Wisconsin is 0 years old; this one is 99 years old.
Nearby Bridges
LRD LAKESIDE PARK over LAKESIDE PARK LAGOON
Built 1991
LRD SERVICE RD (DE over LAKESIDE PARK LAGOON
Built 1965
LRD PARK AVE over LAKESIDE CREEK
Built 1927
LRD WINNEBAGO DR over DE NEVEU CREEK
Built 1955
USH 45 (SCOTT ST) over FOND DU LAC RIVER
Built 1971
LRD SCOTT ST over DE NEVEU CREEK
Built 1965
LRD STOW ST over DE NEVEU CREEK
Built 1926
LRD W ARNDT STREET over FOND DU LAC RIVER
Built 2019
LRD CTH WH over LUCO CREEK
Built 2010
STH 23-JOHNSON ST over DE NEVEU CREEK
Built 2002
Bridge Details
- Structure #
- P20072000000000
- Year Built
- 1927
- Length
- 19.4 m (63.6 ft)
- Max Span
- 18.3 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 3,900
- Material
- Concrete
- Design
- Arch - Deck
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $339,000
- Total Project Cost
- $508,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.