LRD PENTOGA RD over BRULE RIVER

8.0M N JCT STH 70 · County 037, Wisconsin · Built 1930 · 1 Lanes · 22 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
P19001300000000
Year Built
1930
Length
18.6 m (61 ft)
Max Span
18.3 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
22
Material
Steel
Design
Truss - Thru
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$177,000
Total Project Cost
$266,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.