CTH G over BRIDGE CREEK
0.1M N USH 12 · County 035, Wisconsin · Built 1959 · 2 Lanes · 1,646 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
44.681639, -91.119556
This bridge is in worse condition than 92.3% of bridges in County 035. The average bridge in Wisconsin is 0 years old; this one is 67 years old.
Nearby Bridges
STH 27 over BRIDGE CREEK
Built 2017
LRD E MAIN STREET over TOUSSEL CREEK
Built 1986
USH 12 over FIRST TRESTLE CREEK
Built 1988
USH 12-STH 27-LINC over DIAMOND VALLEY CREEK
Built 1988
USH 12 over UNION PACIFIC RR
Built 1988
USH 12-STH 27 over BRIDGE CREEK
Built 1976
LRD BARTIG RD over THOMPSON VALLEY CREEK
Built 1971
USH 12 over THOMPSON VALLEY CREEK
Built 1988
CTH R over THOMPSON VALLEY CREEK
Built 1924
LRD KRUGER RD over BRIDGE CREEK
Built 1995
Bridge Details
- Structure #
- P18070600000000
- Year Built
- 1959
- Reconstructed
- 1997
- Length
- 25.4 m (83.3 ft)
- Max Span
- 12.1 m
- Width
- 11.3 m (37.1 ft)
- Lanes
- 2
- Daily Traffic
- 1,646
- Material
- Prestressed Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $318,000
- Total Project Cost
- $477,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.