LRD MIDDLE RIVER R over MIDDLE RIVER

0.3 M W JCT USH 53 · County 031, Wisconsin · Built 1940 · 2 Lanes · 107 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
P16009200000000
Year Built
1940
Length
8.2 m (26.9 ft)
Max Span
7.6 m
Width
6.2 m (20.3 ft)
Lanes
2
Daily Traffic
107
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$97,000
Total Project Cost
$146,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.