LRD FREMONT RD over S BR ONEILL CREEK

2.0M W JCT USH 10 · County 019, Wisconsin · Built 1976 · 2 Lanes · 116 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
3
Serious
Superstructure
4
Poor
Substructure
4
Poor

Bridge Details

Structure #
P10024000000000
Year Built
1976
Length
11.9 m (39 ft)
Max Span
11.3 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
116
Material
Prestressed Concrete
Design
Channel Beam
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$126,000
Total Project Cost
$189,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.