LRD HEINTOWN RD over WEDGES CREEK

1.5M W JCT CTH G · County 019, Wisconsin · Built 1930 · 2 Lanes · 58 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
P10019100000000
Year Built
1930
Reconstructed
1975
Length
12.8 m (42 ft)
Max Span
12.2 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
58
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.