LRD 80TH AVENUE over BRANCH ELK CREEK
0.2 M W CTH T · County 017, Wisconsin · Built 1970 · 2 Lanes · 180 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 4 | Poor |
Location
44.958472, -91.558111
This bridge is in worse condition than 90% of bridges in County 017. The average bridge in Wisconsin is 0 years old; this one is 56 years old.
Nearby Bridges
CTH T over BRANCH OF ELK CREEK
Built 2022
CTH T over BR ELK CREEK
Built 2023
CTH T over ELK CREEK
Built 1994
CTH T over BR ELK CREEK
Built 1988
LRD 70TH STREET over ELK CREEK
Built 2015
LRD 40TH STREET over CN RR
Built 1929
LRD 85TH AVENUE over ELK CREEK
Built 2007
LRD 40TH STREET over ELK CREEK
Built 1969
LRD 40TH STREET over BRANCH ELK CREEK
Built 2000
CTH T over ELK CREEK
Built 1988
Bridge Details
- Structure #
- P09013200000000
- Year Built
- 1970
- Length
- 7.9 m (25.9 ft)
- Max Span
- 7.6 m
- Width
- 8.4 m (27.6 ft)
- Lanes
- 2
- Daily Traffic
- 180
- Material
- Wood or Timber
- Design
- Slab
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $95,000
- Total Project Cost
- $143,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.