LRD 18TH AVE over SILVER CREEK
0.8M E JCT CTH M · County 005, Wisconsin · Built 1960 · 2 Lanes · 100 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
45.465642, -91.643444
This bridge is in worse condition than 93.4% of bridges in County 005. The average bridge in Wisconsin is 0 years old; this one is 66 years old.
Nearby Bridges
LRD 25TH STREET over SILVER CREEK
Built 2001
LRD 18TH AVE over POKEGAMA CREEK
Built 1969
LRD 18 1/2 AVE over SILVER CREEK
Built 1990
LRD 17 1/4 AVENUE over POKEGAMA CREEK
Built 2010
LRD 25 1/2 STREET over SILVER CREEK
Built 1945
LRD 25TH ST over ROCK CREEK
Built 1978
LRD 25TH ST over POKEGAMA CREEK
Built 1960
CTH M over POKEGAMA CREEK
Built 1983
LRD 27TH ST (DEAD over BR ROCK CREEK
Built 1974
LRD 26TH ST over POKEGAMA CR
Built 2004
Bridge Details
- Structure #
- P03095300000000
- Year Built
- 1960
- Length
- 7.6 m (24.9 ft)
- Max Span
- 7.2 m
- Width
- 7.6 m (24.9 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $93,000
- Total Project Cost
- $140,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.