RANGE 29 ACCESS RD over SUUKJAK SEP CREEK
0.08 MI JCT BIVOUAC RD · County 081, Wisconsin · Built 2021 · 2 Lanes · 10 vehicles/day
Overall
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
44.049681, -90.6765
This bridge is in worse condition than 22.2% of bridges in County 081. The average bridge in Wisconsin is 0 years old; this one is 5 years old.
Nearby Bridges
RANGE 2 SERVICE TR over SUUKJAK SEP CREEK
Built 2010
WEST N STREET over SUUKJAK SEP CREEK
Built 1994
EAST MANEUVER RD over LA CROSSE RIVER
Built 2018
WEST J STREET over SUUKJAK SEP CREEK
Built 1998
TANK TRAIL RANGE 2 over LA CROSSE RIVER
Built 2021
RANGE 2 SERVICE TR over TRIB. TO LA CROSSE RIVER
Built 2010
WEST J STREET over LA CROSSE RIVER
Built 1992
WEST F STREET over LA CROSSE RIVER
Built 1996
SOUTH J STREET over TARR CREEK
Built 1984
SOUTH O STREET over TARR CREEK
Built 1996
Bridge Details
- Structure #
- DAPARCCOY0BR029
- Year Built
- 2021
- Length
- 7.3 m (24 ft)
- Max Span
- 7.3 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 10
- Material
- Concrete
- Design
- Arch - Deck
- Owner
- Other
- Last Inspected
- N/A
- Est. Improvement
- $1,000
- Total Project Cost
- $2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.