LRD LYNN LINE RD over BR E FK BLACK RIVER

1.9M W JCT CTH V · County 141, Wisconsin · Built 2023 · 2 Lanes · 100 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
B71020400000000
Year Built
2023
Length
15.4 m (50.5 ft)
Max Span
14.6 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
100
Material
Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$153,000
Total Project Cost
$229,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.