CTH S over BEAR CREEK

1.7 MI S. JCT CTH H · County 141, Wisconsin · Built 2004 · 2 Lanes · 611 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
B71013700000000
Year Built
2004
Length
12.3 m (40.4 ft)
Max Span
11.6 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
611
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.