STH 54 over YELLOW RIVER

0.6M E JCT CTH X TO S · County 141, Wisconsin · Built 1964 · 2 Lanes · 920 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B71002000000000
Year Built
1964
Reconstructed
2004
Length
54.9 m (180.1 ft)
Max Span
26.9 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
920
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.