USH 10 WB/STH 441 over CTH AP (MIDWAY RD)

1 MI WEST OF STH 47 · County 139, Wisconsin · Built 2018 · 3 Lanes · 52,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
B70042400000000
Year Built
2018
Length
54.6 m (179.1 ft)
Max Span
32.3 m
Width
21.3 m (69.9 ft)
Lanes
3
Daily Traffic
52,300
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$942,000
Total Project Cost
$1,414,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.