IH 41 SB over SAWYER CREEK

5.4M N JCT STH 26 TO S · County 139, Wisconsin · Built 2012 · 4 Lanes · 35,250 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
B70026000000000
Year Built
2012
Length
22.7 m (74.5 ft)
Max Span
11 m
Width
22.7 m (74.5 ft)
Lanes
4
Daily Traffic
35,250
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.