IH 41 SB over CTH BB

1.5M S JCT STH 125 TO E · County 139, Wisconsin · Built 1992 · 3 Lanes · 35,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B70013500000000
Year Built
1992
Length
55.4 m (181.8 ft)
Max Span
27.1 m
Width
18.3 m (60 ft)
Lanes
3
Daily Traffic
35,300
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.