STH 441 SB over USH 10

2.7M S JCT CTH KK · County 139, Wisconsin · Built 1993 · 3 Lanes · 25,550 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B70011600000000
Year Built
1993
Length
51.5 m (169 ft)
Max Span
25.5 m
Width
20.1 m (65.9 ft)
Lanes
3
Daily Traffic
25,550
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$694,000
Total Project Cost
$1,042,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.