LRD N CAMPBELL RD over CAMPBELL CREEK

0.2M N JCT WITZEL AVE · County 139, Wisconsin · Built 1987 · 2 Lanes · 1,700 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B70010700000000
Year Built
1987
Length
12 m (39.4 ft)
Max Span
11.4 m
Width
16.5 m (54.1 ft)
Lanes
2
Daily Traffic
1,700
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.