USH 45 over WILLOW HARBOR BAY TRIB

2.5M N JCT CTH Z · County 139, Wisconsin · Built 1988 · 2 Lanes · 3,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B70010100000000
Year Built
1988
Length
15.9 m (52.2 ft)
Max Span
15.4 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
3,200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.