STH 114 - TAYCO ST over FOX RIVER
2.5M E JCT USH 41 TO N · County 139, Wisconsin · Built 1993 · 4 Lanes · 9,600 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
44.197594, -88.453222
This bridge is in worse condition than 89.8% of bridges in County 139. The average bridge in Wisconsin is 0 years old; this one is 33 years old.
Nearby Bridges
STH 114-WASHINGTON over FOX RIVER
Built 1990
STH 114 - TAYCO ST over FOX RIVER
Built 1993
LRD ACCESS RD over MENASHA CHANNEL
Built 1960
LRD RIVER ST (DEAD over FOX RIVER
Built 1974
LRD RACINE ST over FOX RIVER
Built 2023
STH 114-COMMERCIAL over FOX RIVER
Built 1927
STH 114-COMMERCIAL over FOX RIVER
Built 1927
LRD OAK ST over FOX RIVER
Built 2006
LRD MAIN STREET over WISCONSIN CENTRAL LTD
Built 2001
LRD MAIN ST over NEENAH SLOUGH
Built 1977
Bridge Details
- Structure #
- B70009700010000
- Year Built
- 1993
- Length
- 20.6 m (67.6 ft)
- Max Span
- 20.6 m
- Width
- 19.8 m (65 ft)
- Lanes
- 4
- Daily Traffic
- 9,600
- Material
- Steel
- Design
- Movable - Bascule
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $401,000
- Total Project Cost
- $602,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.