USH 10 WB over STH 49S - STH 54W

1.2M W JCT STH 22 TO S · County 135, Wisconsin · Built 1965 · 2 Lanes · 10,350 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
4
Poor

Bridge Details

Structure #
B68001900000000
Year Built
1965
Reconstructed
1996
Length
73.6 m (241.5 ft)
Max Span
21.9 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
10,350
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,246,000
Total Project Cost
$1,869,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.