LRD HEMLOCK ST over PIGEON RIVER
0.1M N JCT USH 45 · County 135, Wisconsin · Built 1958 · 2 Lanes · 2,500 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
44.623678, -88.762883
This bridge is in worse condition than 96.4% of bridges in County 135. The average bridge in Wisconsin is 0 years old; this one is 68 years old.
Nearby Bridges
STH 22-MAIN ST over PIGEON RIVER
Built 2015
LRD MEMORIAL CIRCL over PIGEON RIVER
Built 1968
LRD LYON ST over PIGEON RIVER
Built 2006
LRD KLEMP RD over PIGEON RIVER
Built 1982
LRD 7TH STREET over EMBARRASS RIVER
Built 1991
STH 156 over EMBARRASS RIVER
Built 1954
CTH D over BR EMBARRASS RIVER
Built 1989
CTH I over EMBARRASS RIVER
Built 1950
LRD BEHNKE RD over EMBARRASS RIVER
Built 1990
CTH XX over EMBARRASS RIVER
Built 1973
Bridge Details
- Structure #
- B68001700000000
- Year Built
- 1958
- Length
- 23.9 m (78.4 ft)
- Max Span
- 22.9 m
- Width
- 12.8 m (42 ft)
- Lanes
- 2
- Daily Traffic
- 2,500
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $302,000
- Total Project Cost
- $454,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.