STH 83 over OCONOMOWOC RIVER

0.1M N JCT CTH VV · County 133, Wisconsin · Built 1916 · 2 Lanes · 4,700 vehicles/day

Overall
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
B67095200000000
Year Built
1916
Length
12.2 m (40 ft)
Max Span
10.7 m
Width
14.8 m (48.6 ft)
Lanes
2
Daily Traffic
4,700
Material
Concrete
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$207,000
Total Project Cost
$311,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.