STH 67 over BARK RIVER

0.2 MI N JCT USH 18 · County 133, Wisconsin · Built 2018 · 3 Lanes · 10,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
B67037600000000
Year Built
2018
Length
23.6 m (77.4 ft)
Max Span
21.9 m
Width
22 m (72.2 ft)
Lanes
3
Daily Traffic
10,300
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.