CTH KF over STH 16

0.2 MI S JCT CTH JF · County 133, Wisconsin · Built 1974 · 3 Lanes · 10,400 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B67017400000000
Year Built
1974
Reconstructed
2015
Length
81.7 m (268 ft)
Max Span
40.8 m
Width
23 m (75.5 ft)
Lanes
3
Daily Traffic
10,400
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.