STH 16 over BARK RIVER

1.4M E JCT STH 83 · County 133, Wisconsin · Built 1951 · 6 Lanes · 30,500 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
B67017100000000
Year Built
1951
Reconstructed
1973
Length
8 m (26.2 ft)
Max Span
3.7 m
Lanes
6
Daily Traffic
30,500
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.