IH 94 EB over STH 83

5.4 MI E JCT STH 67 · County 133, Wisconsin · Built 1962 · 2 Lanes · 35,850 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B67006300000000
Year Built
1962
Reconstructed
1990
Length
59.2 m (194.2 ft)
Max Span
17.7 m
Width
18.3 m (60 ft)
Lanes
2
Daily Traffic
35,850
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$790,000
Total Project Cost
$1,186,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.