STH 60 EB over IH 41

1.0M E JCT STH 175 · County 131, Wisconsin · Built 1991 · 2 Lanes · 13,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B66010200000000
Year Built
1991
Length
100.1 m (328.4 ft)
Max Span
50.3 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
13,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.