STH 33 over MILWAUKEE RIVER

1.3M E JCT USH 45 · County 131, Wisconsin · Built 1975 · 5 Lanes · 18,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
B66006800000000
Year Built
1975
Length
28.5 m (93.5 ft)
Max Span
27.9 m
Width
26.5 m (86.9 ft)
Lanes
5
Daily Traffic
18,800
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.