CTH Y/MEQUON RD over IH 41/USH 45

0.7 MI N JCT STH 167 · County 131, Wisconsin · Built 1969 · 2 Lanes · 4,400 vehicles/day

Overall
Fair
Deck
9
Excellent
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B66003400000000
Year Built
1969
Reconstructed
2023
Length
171.5 m (562.7 ft)
Max Span
51.2 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
4,400
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.